We have encountered a problem with assets that are scheduled to go live with changes that have been made in Safe Edit mode. There is no issue with particular assets that have a workflow present as they will go from Safe Edit > Approved > Live.
The issue arises when the asset does not have a proper workflow (i.e. calendar events) and it goes from Safe Edit > Live on a future scheduled date. What happens is that the asset goes live and loses all the changes made in Safe Edit. This was never an issue before within our system and now it's become and issue.
Response from Squiz support was as follows:
This is expected behaviour, if an asset is in save edit and is set to live it will cancel the edits. The asset needs to be in be in approved to go live status for it to publish the edits. This can be seen on the http://manuals.matrix.squizsuite.net/concepts/chapters/squiz-matrix-concepts
This may be the case, but it was working before but now is not working. Is there a way to do this? We are still using Matrix v4.18.4 - will be upgrading to latest build soon though.